Rail grinding in the tunnel to keep tracks in optimal condition.
SMRT GCEO Mr Neo Kian Hong (centre), SMRT President (Trains) Mr Lam Sheau Kai (right) and Thomson-East Coast Line (TEL) Deputy MD Mr Shahrin Abdol Salam (left) with the handover document that LTA presented to SMRT at Mayflower Station on 30 Apr 2021.
Aerial view of Canberra station.
Wayfinding at Thomson-East Coast Line (TEL) Woodlands station.
SMRT Circle Line (CCL) Rovers.
An SMRT-operated train arriving at a station.
@ SMRT CORPORATION